Sewio RTLS installation planning
Sewio RTLS installation planning aligns the approved anchor layout, model-specific power and backhaul, and RTLS Studio deployment responsibilities. The field scope should end with traceable installed-device records and a defined platform handoff.
1996
Founded
900+
Company-wide deployments
10,000+
Company-wide sites
6
Offices
SRS Networks is a nationwide infrastructure deployment company headquartered in South San Francisco, California, serving enterprises across the 48 contiguous states, Alaska, and Hawaii since 1996. We scope mounting, cabling, network readiness and field documentation against the selected RTLS design. The platform owner specifies the radio layout, commissioning and application acceptance.
Independent planning guidance for Sewio infrastructure. Manufacturer names identify the technology; this page does not represent a certified or authorized manufacturer relationship. SRS field work is scoped against approved instructions and the actual delivery team's qualifications.
Use the project's current deployment package
Sewio's deployment documentation directs newer RTLS Studio bundles through the project's myRTLS access. Identify the person who supplies the current package and configuration instructions. Do not dispatch from a stale downloaded guide.
- Project documentation owner
- RTLS Studio version and access
- Approved installation package
- Named platform engineer
Specify Ethernet or Wi-Fi anchor backhaul
Sewio describes Ethernet and Wi-Fi anchor variants. Confirm the selected hardware, power method and network plan. A generic promise to cable every anchor can misprice the chosen system.
- Anchor type and model
- Power-supply option
- Backhaul and address plan
- Network-owner readiness confirmation
Prepare and identify devices before installation
Tie each anchor to the approved installation point and configuration owner. Keep device labels consistent with the platform schedule. Resolve any duplicate or unknown identifiers before the devices are mounted at height.
- Device inventory
- Location labels
- Configuration owner and revision
- Readiness exception list
Release physical work to the platform team
Return the installation register and the checks required by the project plan. Have the commissioning team record discovery or positioning issues against device IDs. Assign corrections before declaring the field phase accepted.
- Mounted-device register
- Network and cable test evidence
- Platform discovery check
- Commissioning release and exceptions
Send the drawings, device schedule and acceptance owner
Complete the workbook with your platform designer. Record device quantities, approved mounting points, access constraints and infrastructure dependencies. We use those inputs to define field labor and handoff responsibilities.
Email partners@srsnetworks.com with the site count, states and target work window.
Questions to settle before the crew arrives
Where do the current Sewio deployment files come from?
Use the project's current manufacturer delivery channel and software version. Sewio's deployment documentation identifies myRTLS for newer Studio bundles.
Do Sewio anchors always use Ethernet?
The manufacturer describes different backhaul variants. Check the selected model and current power/network instructions before scoping infrastructure.
Is this an authorized Sewio partner page?
No authorization or certification is asserted here. Verify any credential required for the engagement with the manufacturer and the named delivery team.
What belongs in the handoff?
Return anchor IDs, installation locations, infrastructure checks and open exceptions. Assign Studio configuration and positioning acceptance to the platform owner.
What does SRS need to scope the physical work?
Send the site list, states, drawings, device schedule and approved installation instructions. Include access windows and the contact who owns platform commissioning so responsibilities can be agreed before dispatch.
Which costs affect the field estimate?
Mounting access, work windows, pathways, travel, device quantities and readiness gaps affect field labor. Platform licenses, calibration and application integration should be quoted separately by their assigned owners.
How should a pilot become a multi-site deployment?
Accept the pilot against the agreed physical and platform tests before repeating it. Carry forward the approved checklist, record site-specific differences and confirm readiness before each later visit.
What does the scope workbook include?
It records site readiness, device locations, responsibility owners, acceptance checks and cost categories. Complete it with the platform designer and facility owner, then use it to request comparable field estimates.
Related planning and installation resources
Manufacturer references
Reviewed September 10, 2026. Confirm the current model and procedure with the platform owner before dispatch.
- Sewio anchor setup
Anchor variants, preparation and backhaul.
- Sewio deployment documentation
Current project delivery and deployment access.