RedLore RTLS installation planning covers the approved anchor and gateway layout, device identification, asset-tag association and application handoff. Its wire-free architecture should be scoped from the selected devices rather than priced as a cable drop at every anchor.

1996

Founded

900+

Company-wide deployments

10,000+

Company-wide sites

6

Offices

SRS Networks is a nationwide infrastructure deployment company headquartered in South San Francisco, California, serving enterprises across the 48 contiguous states, Alaska, and Hawaii since 1996. We scope mounting, cabling, network readiness and field documentation against the selected RTLS design. The platform owner specifies the radio layout, commissioning and application acceptance.

Independent planning guidance for RedLore infrastructure. Manufacturer names identify the technology; this page does not represent a certified or authorized manufacturer relationship. SRS field work is scoped against approved instructions and the actual delivery team's qualifications.

Separate anchor placement from gateway connectivity

RedLore describes wire-free anchors and a gateway layer. Confirm the selected gateway's power and uplink requirements with the platform owner. Wireless anchors do not establish that every other dependency is already available.

  • Anchor and gateway models
  • Approved locations
  • Gateway power and uplink
  • Coverage and access assumptions

Define who associates tags with assets

RedLore's Scanner App supports tag-to-asset pairing. Assign that data task before field work begins, including the source asset register and the person who checks it. Mounting a tag and assigning it to the correct business asset are separate checks.

  • Asset ID source
  • Tag identifier
  • Association owner
  • Reconciliation and correction procedure

Plan maintenance access while mounting

Record where each device can be reached for service and replacement. Use the selected device's current instructions for mounting and maintenance. Avoid treating advertised battery life as a guaranteed replacement interval for the project.

  • Approved attachment method
  • Maintenance access
  • Device replacement owner
  • Model-specific instructions

Agree the application acceptance record

Specify the assets, zones and conditions used for the trial. Have the platform owner confirm that the expected records reach the application and correspond to the correct assets. Log unresolved items against the device register.

  • Trial assets and zones
  • Gateway and application checks
  • Tag-to-asset verification
  • Accepted exceptions and support owner

Send the drawings, device schedule and acceptance owner

Complete the workbook with your platform designer. Record device quantities, approved mounting points, access constraints and infrastructure dependencies. We use those inputs to define field labor and handoff responsibilities.

Email partners@srsnetworks.com with the site count, states and target work window.

Questions to settle before the crew arrives

Does every RedLore anchor need a cable?

The manufacturer describes wire-free anchors. Use the actual hardware design to identify gateway connectivity and any other wired infrastructure needed at the site.

Who pairs tags with the asset inventory?

Assign a data owner to that task. The field crew's mounting record should reconcile with the platform's tag-to-asset association record.

Is SRS a certified RedLore installer?

This page does not assert manufacturer certification or authorization. Verify required credentials and model-specific procedures before awarding the work.

Can the gateway always use cellular connectivity?

Do not assume it. Confirm the selected gateway model, uplink service and site conditions with the platform owner before including connectivity in the scope.

What does SRS need to scope the physical work?

Send the site list, states, drawings, device schedule and approved installation instructions. Include access windows and the contact who owns platform commissioning so responsibilities can be agreed before dispatch.

Which costs affect the field estimate?

Mounting access, work windows, pathways, travel, device quantities and readiness gaps affect field labor. Platform licenses, calibration and application integration should be quoted separately by their assigned owners.

How should a pilot become a multi-site deployment?

Accept the pilot against the agreed physical and platform tests before repeating it. Carry forward the approved checklist, record site-specific differences and confirm readiness before each later visit.

What does the scope workbook include?

It records site readiness, device locations, responsibility owners, acceptance checks and cost categories. Complete it with the platform designer and facility owner, then use it to request comparable field estimates.