Manufacturer planning guide

Pozyx RTLS installation planning

Pozyx RTLS installation planning starts with the approved anchor layout, tag inventory and positioning-server requirements. Use this guide to separate the physical field package from Pozyx platform commissioning and application integration.

1996

Founded

900+

Company-wide deployments

10,000+

Company-wide sites

6

Offices

SRS Networks is a nationwide infrastructure deployment company headquartered in South San Francisco, California, serving enterprises across the 48 contiguous states, Alaska, and Hawaii since 1996. We scope mounting, cabling, network readiness and field documentation against the selected RTLS design. The platform owner specifies the radio layout, commissioning and application acceptance.

Independent planning guidance for Pozyx infrastructure. Manufacturer names identify the technology; this page does not represent a certified or authorized manufacturer relationship. SRS field work is scoped against approved instructions and the actual delivery team's qualifications.

Freeze the anchor and server schedule

Identify the selected anchors, installation accessories and positioning-server arrangement before estimating field work. Use the current Pozyx instructions for that hardware; a prior site's bill of materials is not a substitute for the new design.

  • Anchor models and quantities
  • Approved drawings and mounting accessories
  • Positioning-server owner
  • Current installation-document revision

Preserve the layout decisions

Pozyx's anchor-location guidance explains why obstruction and geometry matter. Have the platform designer approve the layout and any field deviation. Return the actual installation record to the commissioning owner.

  • Approved anchor locations
  • Obstruction and access observations
  • Position measurement responsibility
  • Written authorization for changes

Schedule the commissioning handoff

Treat mounting and connectivity as the physical release milestone. Identify who configures the system and validates positioning performance. Leave enough coordination time for the commissioning team to resolve device or layout discrepancies.

  • Device register and connection record
  • Commissioning contact and access window
  • Calibration responsibility
  • Performance-test acceptance owner

Keep platform and field costs visible

Separate anchor installation, infrastructure and access work from software licensing and integration. Ask for current manufacturer terms for the selected deployment. Use the same scope workbook when comparing field bids.

  • Hardware and field scope
  • Software/license quotation
  • Application interfaces and owner
  • Support and replacement responsibilities

Send the drawings, device schedule and acceptance owner

Complete the workbook with your platform designer. Record device quantities, approved mounting points, access constraints and infrastructure dependencies. We use those inputs to define field labor and handoff responsibilities.

Email partners@srsnetworks.com with the site count, states and target work window.

Questions to settle before the crew arrives

Is SRS listed as a Pozyx-authorized installer?

This page does not claim that status. If your procurement requires Pozyx authorization, verify the current manufacturer listing and the named delivery team before award.

Who commissions the Pozyx system?

Name the qualified Pozyx platform owner in the scope. Do not assume that mounting and connecting an anchor includes calibration or application integration.

What should the field crew receive?

Provide the released layout, hardware schedule, mounting instructions, network prerequisites and a commissioning contact. Identify who can approve a changed installation point.

Can I use another facility's anchor layout?

Use it only as planning context. The platform designer must approve the layout for the actual geometry, obstructions and tracking requirement.

What does SRS need to scope the physical work?

Send the site list, states, drawings, device schedule and approved installation instructions. Include access windows and the contact who owns platform commissioning so responsibilities can be agreed before dispatch.

Which costs affect the field estimate?

Mounting access, work windows, pathways, travel, device quantities and readiness gaps affect field labor. Platform licenses, calibration and application integration should be quoted separately by their assigned owners.

How should a pilot become a multi-site deployment?

Accept the pilot against the agreed physical and platform tests before repeating it. Carry forward the approved checklist, record site-specific differences and confirm readiness before each later visit.

What does the scope workbook include?

It records site readiness, device locations, responsibility owners, acceptance checks and cost categories. Complete it with the platform designer and facility owner, then use it to request comparable field estimates.