Network RFP Guide

How to Write a Network Installation RFP
without leaving the cutover to chance.

A network installation RFP must define the site list, existing environment, hardware ownership, configuration responsibility, cabling scope, cutover window, rollback plan, acceptance tests, documentation, and pricing format. Separate what the buyer supplies from what the installer supplies. If configuration and cutover ownership are ambiguous, bidders will price different projects.

1996
Founded
500+
Deployments
5,000+
Sites served
48
Contiguous states

SRS Networks is a nationwide IT infrastructure deployment partner headquartered in South San Francisco, California, serving multi-site enterprises across 48 states since 1996. This page turns field-delivery requirements into a scope, comparison, and acceptance record a buyer can use.

Ten sections that make the scope executable

SectionRequired decisionFailure if omitted
EnvironmentCurrent topology, circuits, closets, and dependenciesDiscovery after award
ResponsibilityBuyer-furnished and installer-furnished equipmentMissing hardware and labor
CutoverWindow, owner, rollback trigger, and escalation pathUncontrolled outage
AcceptanceTests, evidence, signoff owner, and closeout formatNo objective completion point

Start with the site matrix

List every site, archetype, circuit status, operating window, local contact, and targeted wave. The matrix is the controlling document for schedule and price.

Name the handoffs

State who stages, configures, ships, receives, racks, patches, tests, cuts over, monitors, and approves. One unnamed handoff can stop an otherwise complete deployment.

Make closeout a deliverable

Require photos, port maps, cable results, device serials, configuration evidence, exceptions, and signed acceptance in a defined folder structure.

When this is not the right approach

For one small office with a known bill of materials and no production cutover, a detailed scope and two quotes are usually faster than a formal RFP.

Straight answers

A network installation RFP must define the site list, existing environment, hardware ownership, configuration responsibility, cabling scope, cutover window, rollback plan, acceptance tests, documentation, and pricing format. Separate what the buyer supplies from what the installer supplies. If configuration and cutover ownership are ambiguous, bidders will price different projects.

Put a field-executable scope in front of the crew

Email the site count, geography, schedule, and current documents. Cheryl routes the request to the right deployment lead.

Send Us the RFP
partners@srsnetworks.com · (866) 224-3636