Tenant Improvement IT

IT Infrastructure for Tenant Build-Outs

Tenant improvement projects have tight timelines and zero room for IT delays. When network infrastructure is treated as an afterthought, it ends up on the critical path - pushing occupancy dates and creating expensive last-minute change orders that nobody budgeted for.

SRS coordinates with your GC to deliver move-in ready network infrastructure - on time, every time, with zero surprises at closeout.

The Problem

Why TI Projects Keep Getting Burned by IT

IT infrastructure is invisible until it fails to materialize on time. These are the five problems that put IT work on the critical path and push your move-in date back.

IT Work Holding Up Certificate of Occupancy

Cabling and network infrastructure left until the end of a build-out delays occupancy inspections and pushes move-in dates back by weeks. IT work that isn't coordinated early becomes the last item on the punch list.

No Coordination Between IT and Your General Contractor

When IT and the GC are working from different schedules with no shared scope, conduit gets missed, pull boxes land in the wrong locations, and change orders stack up. The blame game costs everybody money.

Cabling Installed After Walls Are Already Closed

Structured cabling that should have been rough-in during framing gets scheduled after drywall. The result is surface-mounted raceways, cable runs through finished ceilings, and extra cost for work that should have been clean.

Inadequate Power and Cooling Planning for IT

Telecommunications rooms and server closets spec'd without IT input end up undersized, under-powered, or without proper cooling. Retrofitting these spaces after construction is expensive and often disruptive.

Last-Minute Change Orders Blowing the Budget

IT requirements discovered late in a build-out translate directly into change orders. Core, conduit, and power conflicts found during rough-in are cheap to fix. The same issues found at closeout are not.

The Solution

IT Engaged Early - Delivered On the GC's Schedule.

SRS Networks enters TI projects at the pre-construction phase - reviewing drawings, coordinating conduit and pull box placement, and integrating IT milestones into the GC's master schedule. We install rough-in at framing, terminate at closeout, and test before the keys are handed over. The tenant gets a live, certified network on move-in day. No exceptions.

Early IT engagement in TI planning - before permits are pulled, before walls go up
Coordinated scheduling integrated directly into the GC's master construction timeline
Pre-construction cabling rough-in and conduit pathways installed at framing stage
Move-in ready network and wireless infrastructure, tested and documented before handoff
Single IT vendor managing the entire build-out - no handoffs, no gaps in scope
Structured cabling installation in commercial tenant improvement build-out
SRS TI project phases - coordinated with your GC
Design
Drawing review, telecom room spec, conduit pathway layout before permits
Rough-In
Conduit, J-hooks, and backboxes installed during framing - walls still open
Cabling
Horizontal and backbone cabling pulled, labeled, and dressed at drywall stage
Termination
Patch panels, jacks, and telecom room buildout completed at closeout
Handoff
100% port certification, wireless validation, and as-built documentation
Move-in ready. Every time.
GC-coordinated and deployed by SRS Networks
What's Included

Complete IT Coverage for Your TI Project

SRS manages every IT phase of a tenant improvement project - from pre-construction planning through move-in testing - under a single scope with a single point of contact.

Pre-Construction IT Planning

SRS engages at the design phase to review architectural drawings, identify telecom room locations, specify conduit pathways, and define power and cooling requirements before a single wall is framed.

Telecom room sizing and power requirements
Conduit pathway and pull box layout
Coordination with electrical and mechanical subs

Structured Cabling & Conduit

Horizontal and backbone cabling installed at the right phase of construction - rough-in during framing, terminations during closeout. Every run labeled, tested, and certified to TIA-568 standards.

Cat6A and fiber horizontal cabling
Backbone and riser cabling between floors
TIA-568 certification and test documentation

Network & Wireless Deployment

Switch stack installation, wireless access point deployment, and network configuration completed before move-in. Tenant takes occupancy with a live, tested network - no waiting for IT after the keys are handed over.

Network switch configuration and rack buildout
Wireless coverage design and AP deployment
VLAN and SSID configuration for tenant needs

Move-In Readiness Testing

Every data port, every wireless zone, and every network path tested and documented before the tenant's first day. We don't hand off until the network is verified - and we provide full as-built documentation at closeout.

100% port testing and certification
Wireless survey validation post-deployment
As-built drawings and cable schedules
The Difference

Uncoordinated IT Build-Out vs. SRS TI Deployment

The difference between an IT sub that shows up late and one that's embedded from the design phase shows up directly in your project timeline, budget, and move-in date.

Category
Without SRS
SRS Networks
IT coordination
IT scoped separately, discovered conflicts late in construction
SRS embedded in GC coordination from design phase forward
Cabling timing
Cabling installed after walls are closed - expensive and messy
Rough-in at framing stage, terminations at closeout - clean and on schedule
Move-in readiness
Tenant moves in before network is live - IT scrambling post-occupancy
Network tested and operational before keys are handed over
Change order frequency
Frequent IT change orders from late-discovered conflicts
Conflicts resolved in planning - not during construction
GC alignment
No shared schedule between GC and IT sub - constant friction
IT milestones integrated into GC master schedule from day one
Timeline impact
IT work on critical path, delaying certificate of occupancy
IT scoped and phased to stay off the critical path
Testing & sign-off
No formal IT testing before move-in - issues discovered after occupancy
100% port and wireless testing with documented results at closeout
Documentation
No as-built records - IT team inherits an undocumented buildout
Full as-built drawings, cable schedules, and network diagrams at handoff
Real-World Use Cases

TI Projects Where Move-In Timing Is Non-Negotiable

From medical offices to co-working conversions, SRS delivers IT infrastructure that lands on the GC's schedule - not after it.

Commercial Office Build-Outs

Full-floor and multi-floor office TI projects where IT infrastructure needs to be move-in ready on the GC's delivery date. SRS keeps IT off the critical path by starting early and staying coordinated.

Medical Office Fit-Outs

Healthcare TI projects carry strict compliance requirements and specific infrastructure needs for medical devices, EMR systems, and clinical workflows. SRS plans IT to fit the clinical environment - not the other way around.

Retail Store Build-Outs

High-velocity retail build-outs where POS systems, wireless coverage, and security infrastructure need to be live and tested before store opening day. Zero tolerance for opening delays caused by IT.

Co-Working Space Conversions

Flexible work environments demand scalable, segmented network infrastructure with high-density wireless. SRS designs IT for tenant flexibility from the start - not retrofitted around a finished buildout.

Why SRS Networks

We Start at the Design Table - Not at the Punch List.

Most IT problems on TI projects trace back to a single decision: treating IT as a finish trade instead of a coordination partner. SRS enters the project at the design phase, stays in sync with the GC throughout construction, and delivers a tested, documented network on the day the tenant moves in.

We engage at the pre-construction phase - before conflicts and change orders become expensive
Dedicated GC coordination contact so your general contractor always has a single IT point of contact
Proven process for managing cabling, network, and wireless as a single coordinated scope
Full move-in readiness documentation delivered at project closeout - every port certified, every run labeled
50 States
Nationwide TI Coverage
GC-Coordinated
Integrated Scheduling
Move-In Ready
Network Before Keys
Zero Delays
From IT on Your Build
Related Services

Explore More from SRS Networks

For ongoing managed IT services and support, visit srsnetworks.net

Ready to Keep IT Off Your Critical Path?

If you're planning a tenant improvement project and need an IT partner who can coordinate with your GC from the design phase through move-in day, SRS Networks has the process to make it happen on schedule.