Networks Built for the Production Floor.

Install plant-approved switches, APs, cabling and enclosures under released drawings and authorized production work windows.

Plant IT and controls engineers approve network architecture, equipment ratings, software configuration and production acceptance. SRS installs the specified physical links and devices and records field tests and open exceptions.

Coordinate production-area access, mount and cable approved equipment and provide site, port and physical-link test records for the plant owner.

the 48 contiguous states, Alaska, and Hawaii
Deployment Coverage
Approved Drawings
Installation Basis
Industrial Grade
Hardware Only
Agreed Windows
Target
The Problem

Why Standard IT Networks Fail in Manufacturing

Manufacturing environments expose every weakness in generic network deployments. The consequences aren't an inconvenience - they're measured in halted production, security incidents, and equipment failures that could have been prevented.

Production Downtime Caused by Network Failures

A single switch failure or wireless outage on the production floor doesn't just inconvenience workers - it stops the line. In manufacturing, unplanned downtime is measured in dollars per minute. Networks built on office-grade equipment can't meet that standard.

No Separation Between Office and Production Networks

When corporate IT and OT systems share the same flat network, a single compromised workstation can reach every PLC, HMI, and SCADA system on the floor. That's not a theoretical risk - it's how ransomware takes down production facilities.

Consumer-Grade Equipment in Harsh Environments

Standard office switches and access points fail in manufacturing environments. Metal dust, vibration, humidity swings, and extreme temperatures destroy hardware that wasn't designed for industrial conditions - and failures always happen at the worst possible moment.

No Visibility Into OT Network Health

Most manufacturers have no real-time insight into what's happening on their operational technology network. By the time someone notices a problem, production is already affected. Without monitoring, you're always reacting - never preventing.

Unmanaged Switches Daisy-Chained Across the Floor

Unmanaged switches installed without a structured topology are a compounding liability. They can't be monitored, can't enforce VLANs, can't prioritize traffic, and create single points of failure. This is the default state in too many facilities.

The Solution

Industrial Infrastructure Built for How Manufacturing Works.

Install plant-approved switches, APs, cabling and enclosures under released drawings and authorized production work windows.

Approved IT/OT Field Installation under the customer-approved project scope
Industrial Hardware Installation under the customer-approved project scope
Production Floor AP Installation under the customer-approved project scope
OT Installation Closeout under the customer-approved project scope
Site-specific test records and installation handoff with unresolved exceptions identified
Engineer working on industrial network infrastructure in manufacturing facility
What your manufacturing network looks like post-deployment
OT Zone
Production equipment connected to the customer-approved physical port schedule
IT Zone
Corporate links installed and labeled to the approved segregation plan
Floor WiFi
Industrial APs mounted and cabled at designer-approved locations
IoT
Specified IoT connections installed and recorded for the controls owner
Field Records
Physical-link test records and open exceptions handed to plant operations
Built for production uptime.
Deployed and supported by SRS Networks
What's Included

Complete Manufacturing Network Deployment

Coordinate production-area access, mount and cable approved equipment and provide site, port and physical-link test records for the plant owner.

Approved IT/OT Field Installation

Install the physical links and equipment specified in the plant-approved segmentation design. Plant IT and controls engineers own VLANs, firewall policy, PLC programming and process acceptance.

Approved IT/OT port schedule
Labeled production connections
Controls-owner handoff

Industrial Hardware Installation

Install the designer-approved switches, access points and enclosures at their specified locations. Confirm the released equipment ratings and escalate mismatches before installation.

Approved industrial device list
DIN-rail and enclosure mounting
Cable and connection records

Production Floor AP Installation

Mount and cable APs at approved production-floor locations. Coordinate lifts and work-area release with plant operations; the wireless designer owns RF calculations and channel settings.

Approved AP mounting locations
Production access coordination
Agreed field-test records

OT Installation Closeout

Document installed devices, physical links and unresolved field exceptions for the plant operations team. The customer owns monitoring platforms, alert configuration and ongoing network operation.

Device and port inventory
Physical-link test results
Plant acceptance records
The Difference

Generic IT Network vs. SRS Industrial Deployment

Plant IT and controls engineers approve network architecture, equipment ratings, software configuration and production acceptance. SRS installs the specified physical links and devices and records field tests and open exceptions.

Category
Without SRS
SRS Networks
Network segmentation
Flat network - office and production systems share the same layer
Approved IT/OT port schedule
Hardware rating
Office-grade switches and APs not built for industrial conditions
Approved industrial device list
SCADA protection
PLCs and SCADA systems accessible from corporate network
Approved AP mounting locations
WiFi design
Generic AP placement with no consideration for industrial RF
Device and port inventory
OT visibility
No monitoring - problems discovered after production impact
Labeled production connections
Hardware durability
Equipment failures from vibration, dust, and temperature swings
DIN-rail and enclosure mounting
IoT connectivity
IoT devices on unmanaged networks with no traffic control
Production access coordination
Support model
Multiple vendors - no single team accountable for the full stack
Physical-link test results
Real-World Use Cases

Facilities We Deploy In

SRS Networks deploys industrial network infrastructure across discrete manufacturing, food and beverage, automotive, and pharmaceutical facilities - each with distinct environmental and regulatory demands.

Discrete Manufacturing Plants

Assembly lines, robotics cells, and quality inspection stations all require reliable, segmented network connectivity. SRS installs the specified cabling and hardware under the customer-approved design; record site access, field tests and specialist acceptance dependencies before handoff.

Food & Beverage Processing

Washdown environments, temperature extremes, and strict compliance requirements demand network infrastructure that's both durable and documented. SRS installs the specified cabling and hardware under the customer-approved design; record site access, field tests and specialist acceptance dependencies before handoff.

Automotive Assembly

High-density robotics, automated guided vehicles, and time-sensitive production data create demanding network requirements. SRS installs the specified cabling and hardware under the customer-approved design; record site access, field tests and specialist acceptance dependencies before handoff.

Pharmaceutical Production

Regulated environments require networks that are both functional and auditable. SRS installs the specified cabling and hardware under the customer-approved design; record site access, field tests and specialist acceptance dependencies before handoff.

Why SRS Networks

Manufacturing Networks Require a Different Approach.

Most network vendors don't differentiate between an office and a production floor. We do. Every manufacturing engagement starts with OT/IT segmentation as a given, uses hardware rated for the facility conditions, and is validated against the actual systems running production before we hand off the keys.

Approved IT/OT port schedule checked before mobilization
DIN-rail and enclosure mounting with a named field lead
Agreed field-test records documented for customer review
Consistent site, rack, cable and acceptance records at project handoff
the 48 contiguous states, Alaska, and Hawaii
Nationwide Deployments
IT/OT
Approved Port Plan
Industrial
Grade Hardware
Agreed
Work Windows

Ready to Build a Network Your Production Floor Can Rely On?

SRS executes the customer-approved physical installation plan, records the agreed field tests and hands site exceptions to the named technical owner for acceptance.

Agree the deployment scope before scheduling crews

Use these questions to separate site readiness, installation and acceptance responsibilities in your request for a proposal.

Who coordinates network buildouts across manufacturing facilities?

SRS Networks coordinates the physical network deployment for manufacturing sites, including cabling, fiber, racks and approved wireless installations. The plant team defines production constraints and system ownership. Build the field schedule around authorized work windows, with a named decision-maker for changes affecting production.

What information is needed before a plant survey?

Provide available floor plans, production schedules, network drawings and the equipment areas included in the project. Identify sanitation, washdown, temperature and access conditions. The survey should document uncertainty as well as measured quantities so the estimate does not assume every area is an ordinary office.

Who approves changes to production equipment connections?

The plant equipment and controls owners approve production-side changes. Name those owners alongside the enterprise IT lead and record the permitted field tasks. An approved network deployment scope does not automatically authorize PLC programming, machinery changes or a process-control redesign.

How do you plan work at a facility running around the clock?

Divide work into areas the operations team can release and restore within agreed windows. Record escorts, access restrictions, temporary protection and rollback contacts before dispatch. If a safe window is unavailable, carry that task as a scheduling dependency rather than promising uninterrupted production.

Can employee parking-lot cameras share the network project?

They can be surveyed as a related field scope when the operator approves it. Document mounting, power, connectivity, coverage objectives and who operates the security platform. Keep camera acceptance and network acceptance distinct so a working data link is not mistaken for a fully tested security system.

How should industrial equipment ratings be selected?

Record the actual environmental conditions and check the proposed product against its manufacturer documentation. Have the responsible designer approve the selection. Installation experience alone does not establish suitability for every washdown, hazardous-location or temperature requirement.

What evidence should a manufacturing deployment hand over?

Require a site-specific cable and port schedule, installation photographs, agreed test results, drawing updates and a list of exceptions. Separate the field completion record from controls-system approval. Each plant should use consistent identifiers so the portfolio owner can compare completion across facilities.

What drives the price of a plant network buildout?

Access equipment, pathway construction, fiber distances, environmental requirements and production windows drive labor and materials. Record these assumptions against the site quantities. A budget request should identify which design and controls responsibilities remain with the plant or its specialist vendors.

Prepare the site-survey checklist, compare the installation deliverables in each bid, and use the RFP scope template to record the work you want priced.

Email the site list and current drawings to partners@srsnetworks.com. Cheryl routes the request to the deployment team.